For the construction of a new marina on the west side of Dover Harbour, hundreds of steel piles are needed to be driven into the seabed using a hydraulic hammer. Due to the very large number of piles, there was invested in two unique, innovative piling templates to be able to place them in the right position at a faster pace. In cooperation with TWD, Hydrauvision took care of the engineering, production and installation of all hydraulic components and associated piping.